Heat staking case studies
Short stories from real production problems: what was going wrong, what U.S. Heatstake built, and what changed. Find the one that looks like your line.
Problem: six manual insertions on every part
Automating Six Inserts to Improve Ergonomics, Quality, and Cycle Time
A benchtop system installs all six inserts in one controlled cycle. No more repetitive manual insertion, less scrap, more throughput without adding labor.
Problem: every part needed an 8-minute CMM check
Eliminating 100% CMM Inspection with Precision Insert Installation
Encoder feedback on every 1/4-20 brass insert held height within about 0.003" and removed the inspection bottleneck entirely.
Problem: plastic stuck to the hot probe and pulled away
Using Controlled Heating and Cooling to Seal a Small Polycarbonate Port
Impulse tooling cools while still in contact, so a 1–2 mm port seals and stays sealed when the tool retracts.